Glass Cutting Optimisation: More Glass per Sheet, Less Waste

Glass Cutting Optimisation: More Glass per Sheet, Less Waste

In a glass company the most expensive raw material is the sheet, and every square centimetre that is not used is money. Glass cutting optimisation is the job of placing panes on sheets with the least waste. This article explains where waste comes from, the difference between total waste and real waste, why the last sheet matters and why the cutting plan belongs inside your orders.

What is glass cutting optimisation?

The panes to cut (width × height × quantity) and the sheets in stock (size and quantity) are known. Optimisation places the panes on the sheets and produces a cutting plan: how many of each sheet to use and where each pane is cut on each sheet. A good plan opens fewer sheets, leaves less waste and consists only of cuts your table can make.

Where does waste come from?

  • Edge trims: strips cut from the edges of the sheet.
  • Cut allowance and distance between cuts: the table needs a minimum distance between two cuts.
  • Gaps: areas between panes and at the end of the sheet where no other pane fits.
  • Size direction: patterned glass cannot be rotated, so there are fewer layout options.
  • Sheet choice: opening the wrong sheet size when several sizes are in stock.

Edge trims and cut allowance are rules of the table; what can be reduced are the gaps and the sheet choice. That is the real job of optimisation.

Total waste and real waste

Most plans show a single waste rate: the glass area subtracted from the area of the sheets used. But that rate also counts the large, usable piece left on the last sheet as waste. If that piece goes back to stock and is used in the next job, it is not waste.

Real waste is the waste calculated without that large offcut. Example: in a plan with 83 panes, 69.28 m² and 4 sheets (6000 × 3210), total waste is 10.1%, and real waste, excluding the 4.43 m² offcut left at the end, is 4.6%. Knowing which figure tells the truth helps you price correctly and order the right number of sheets.

The top line of the plan shows total waste (10.1%) and real waste excluding the offcut left at the end (4.6%).

The last sheet: offcut or waste?

If the panes are spread across the whole last sheet, the remaining area is cut into small, useless pieces. If the panes are packed to one end, one large offcut is left; it goes back to stock and is used in the next job.

On the last sheet the panes are packed to one end; the remaining 1380 × 3210 mm piece goes back to stock and is not counted as waste.

The rules of the table

A plan that looks perfect on paper is useless if the table cannot cut it. The plan must follow these rules:

  • Guillotine cuts: every cut runs from edge to edge of the sheet (or piece).
  • Edge trims (left, right, bottom, top), cut allowance and the minimum distance between cuts.
  • Size direction: patterned glass is placed without rotation.
  • Cutting stages: the number of stages the table can handle is not exceeded.

Try the OGTOGLASS glass software

Let us work out a cutting plan together using your own orders.

Why the cutting plan belongs inside your orders

In companies using a separate optimisation program the flow is usually: list the orders, export the list or retype the sizes, make the plan, send it to the table. Every transfer is a chance for a typing error and a loss of time, and which order went into which plan is tracked somewhere else.

When the cutting plan is inside the order software, sizes are never moved: orders waiting to be cut are already listed, you tick them and the plan is calculated. Panes from upcoming orders that fit into the gaps can be suggested from the same list. For the steps after cutting, see glass production tracking.

The OGTOGLASS cutting plan

  • From order straight to cutting: orders waiting to be cut are listed with their panes and delivery dates; tick them and the plan is calculated at once.
  • Which sheet and how many: the program knows the sheet sizes and quantities in stock and picks how many of each to use for the least waste.
  • Real waste is shown next to total waste; on the last sheet the panes are packed to one end.
  • Gaps get filled: panes from upcoming orders that fit without an extra sheet are suggested; add them with "Add to Plan".
  • Long Optimisation: for important jobs, different layouts are tried for 15 seconds and the one with the fewest sheets is kept.
  • To the table by USB: a Bottero cutting table file (.r01); sent files and layouts are kept and can be printed again.
  • Clear printouts: each pane shows its size, order number and the customer's short name; offcut sizes are marked too.

Details: Cutting plan feature.

In numbers

Tested on 962 real cutting jobs: in 93% of them it used the same number of sheets or fewer than a widely used cutting optimisation program. The total difference in sheets is under 1%. Most jobs are planned in a few seconds.

Sample plan: 83 panes, 69.28 m², 4 sheets; sheet 1 is 97% full; one 1380 × 3210 mm offcut left on the last sheet.

Frequently asked questions

What does glass cutting optimisation mean?

Placing the panes to be cut on the sheets in stock with the least waste, following the rules of the cutting table. The result is a cutting plan: how many of each sheet to use and where each pane is cut on each sheet.

How is real waste calculated?

It is the total waste minus the large offcut left on the last sheet, which goes back to stock. In the OGTOGLASS sample plan total waste is 10.1% and real waste is 4.6%.

Which cutting table does OGTOGLASS prepare files for?

The plan is written as a Bottero cutting table file (.r01) and taken to the table by USB. Sent files and layouts are kept.

Do I need a separate optimisation program?

Not if you use OGTOGLASS. The cutting plan is built in; you just tick the orders waiting to be cut.

Try the OGTOGLASS glass software

We will give you a short demo using your own orders.

Request a demo

Is it right for your company? Let's find out together.

We will give you a short demo using your own orders and plan the move from your current program.